Industrial lifting project case banner

CASE

Project Case · 2026-03-26

Baohan Expressway Dahena Bridge Erection

Lifting equipment: Bridge Erection Machines, Rubber-Tyred Gantry Cranes, And Specialized Gantry Cranes for Tunnel Operations
Baohan Expressway Dahena Bridge Erection

Project Overview

Baohan Expressway Dahena Bridge Erection is one of SHENLI's representative lifting projects for complex infrastructure construction and heavy-duty site operations.

The selected solution used Bridge Erection Machines, Rubber-Tyred Gantry Cranes, And Specialized Gantry Cranes for Tunnel Operations to match the site's lifting process, construction rhythm, working area, and safety requirements.

Before equipment configuration, the project conditions should be reviewed around load weight, lifting height, span, travel distance, foundation constraints, wind exposure, installation access, and long-term maintenance needs.

For similar bridge, railway, yard, and infrastructure projects, SHENLI can support crane selection, technical drawing review, manufacturing, delivery planning, installation guidance, and after-sales service.