Industrial lifting project case banner

CASE

Project Case · 2026-03-26

Yinying River Bridge On Yangda Railway

Lifting equipment: Gantry Cranes, Tower Cranes, And Construction Elevators
Yinying River Bridge On Yangda Railway

Project Overview

Yinying River Bridge On Yangda Railway is one of SHENLI's representative lifting projects for complex infrastructure construction and heavy-duty site operations.

The selected solution used Gantry Cranes, Tower Cranes, And Construction Elevators to match the site's lifting process, construction rhythm, working area, and safety requirements.

Before equipment configuration, the project conditions should be reviewed around load weight, lifting height, span, travel distance, foundation constraints, wind exposure, installation access, and long-term maintenance needs.

For similar bridge, railway, yard, and infrastructure projects, SHENLI can support crane selection, technical drawing review, manufacturing, delivery planning, installation guidance, and after-sales service.